Perform daily maintenance at the start of each shift or after every 8 hours of operation. These checks take approximately 10–15 minutes.

Pre-Start Inspection (Beginning of Shift)

ItemCheck PointCriteria
Hydraulic oil levelSight glass on tankBetween 2/3 and 3/4 of sight glass
Hydraulic oil temperatureController HMI or oil thermometer20–55°C (ideal), < 60°C (alarm)
Coolant flowFlow indicator / return sight glassSteady flow, no air bubbles
Lubrication systemGrease reservoir level≥ 1/3 full
Lubrication linesVisual check at lubrication pointsOil present at all points
Tie bar nutsVisual checkNo visible loosening or shifting
Safety doorsOpen/close both front and rear doorsSmooth operation, switches click
Emergency stopPress and release each E-stop buttonImmediate stop, proper reset
Hydraulic leaksFloor under machine, hose connectionsNo active drips or puddles
Oil filter indicatorVacuum/pressure gauge on filterWithin green zone
Barrel heater bandsVisual checkNo discoloration, no loose wires
ThermocouplesHMI temperature readoutStable readings, no open-circuit alarms
Screw / barrel areaVisual checkNo material leakage from nozzle or vent

During Operation Checks

ItemObservationAction if Abnormal
Abnormal noise from pumpSteady hum, no knocking/grindingStop machine, inspect pump coupling and mounting
Abnormal vibrationSmooth cycle motionCheck tie bar tension, leveling, anchor bolts
Oil temperature trendRising toward 55°C+Check cooler, clean if needed
Cycle time driftCompared to baselineCheck hydraulic valves, accumulators, material
Product quality variationWeight, dimensions, flashCheck mold, process parameters

End of Shift

  1. Clean the machine area — remove oil, plastic drool, and debris
  2. Record oil temperature at end of shift
  3. Log any alarms or unusual observations in the machine logbook
  4. If the machine will idle > 8 hours, purge the barrel with a heat-stable material (e.g., PP or HDPE)
⚠️

Never leave the machine with heat-sensitive material (e.g., PVC, POM) in the barrel during an extended shutdown. Purge immediately.