Clamping Unit

Toggle-Type Clamp

ComponentMaintenanceFrequency
Toggle pins and bushingsGrease via central lubricationEvery cycle
Toggle pin axial playMeasure with dial indicatorYearly (replace if > 0.3 mm)
Crosshead guide railsClean and greaseWeekly
Clamp cylinder sealsInspect for leakageMonthly
Mold height adjustment mechanismGrease threadsYearly
Moving platen guide shoesAdjust clearance (0.05–0.10 mm)Quarterly

Two-Platen Clamp

ComponentMaintenanceFrequency
Tie bar nut clamping mechanismCheck lock/unlock functionWeekly
Axial displacement sensorsCheck zero pointMonthly
Platen guide railsClean and greaseDaily
Clamp cylinder rod sealsInspect for leakageMonthly

Injection Unit

ComponentMaintenanceFrequency
ScrewPull and inspect flightsMonthly
Non-return valve (check ring)Measure ring gapQuarterly (replace if > 0.1 mm)
BarrelMeasure I.D. at feed, transition, metering zonesYearly
Screw drive gearboxCheck oil levelWeekly
Screw drive gearbox oil changeReplace gear oilYearly
Injection cylinder rod sealsInspect for leakageWeekly
Carriage guide railsGreaseWeekly
Nozzle / sprue alignmentCheck alignment to moldMonthly
Heater bandsMeasure current draw per zoneQuarterly
ThermocouplesCompare to calibrated referenceQuarterly

Tie Bar Maintenance

Tie bars are the most critical structural components of the clamping unit. Uneven tie bar stress causes mold damage, poor part quality, and machine frame fatigue.

Tie Bar Elongation (Stretch) Measurement

  1. Install dial indicators or ultrasonic sensors at the outboard end of each tie bar.
  2. Apply clamp force at the normal set point.
  3. Record the stretch for each bar.
  4. Target: all four bars within ±5% of each other.
  5. If out of tolerance, re-torque the nut on the low-stretch bar to increase its load.

Tie Bar Inspection Schedule

InspectionFrequency
Visual check for thread damageMonthly
Nut alignment mark checkWeekly
Elongation measurementMonthly (first 6 months), then quarterly
Magnetic particle (MT) crack inspectionYearly
Ultrasonic (UT) for internal cracksYearly (high-cycle machines)

Ejector Unit

TaskFrequency
Cycle full stroke, check smoothnessWeekly
Inspect ejector rods for bendingMonthly
Lubricate ejector guide bushingsWeekly
Check ejector return functionWeekly

Screw / Barrel Wear Limits

Screw DiameterNew ClearanceReplace at
≤ 30 mm0.08–0.12 mm> 0.30 mm
31–60 mm0.10–0.18 mm> 0.40 mm
61–90 mm0.15–0.25 mm> 0.50 mm
> 90 mm0.20–0.30 mm> 0.60 mm

Screw and barrel wear accelerates once the nitrided case is worn through. Regular measurement helps plan replacement before wear causes shot weight instability.